Validate a UPS, inverter, and battery configuration before it's installed, monitor it continuously once it's running, or audit it once — no ongoing commitment required.
The same three axes DCiEra tracks across the whole network, applied here to one unit — never collapsed into a single score.
Fault history, standby readiness, and failure patterns tracked per physical unit — so you know which UPS in the fleet is actually degrading, not just which site had an incident.
Bypass-path integrity, breaker ratings checked against actual bus voltage, and earthing checked against IEC/IEEE/IS standards — flagged the moment a reading crosses a threshold.
Round-trip efficiency and backup-runtime loss translated into rupees — so a fading battery bank shows up as a number, not just a hunch.
Design/pre-commissioning review validates a proposed UPS, inverter, or battery configuration against compatibility rules and calculated ratings before anything goes in. Used by dealers and OEMs quoting a job, consultants finalizing a design, and facility teams specifying their own expansion.
Every incident is logged per physical unit, tagged by its role (main or standby), and continuously assessed on three independent axes — reliability, safety, and energy efficiency — never collapsed into one score. Used by maintenance teams on their own fleet, and by vendors staying engaged as the ongoing service relationship.
A single audit's worth of data, uploaded once, feeds straight into that audit's findings — no ongoing monitoring commitment. Built for auditors running standalone engagements, including on behalf of clients not yet on DCiEra.
Validate what you're about to sell, then keep serving it. Free unlimited technician seats for your field team.
Size real, reactive, and apparent load before you design a solution — the same standards-backed check a consultant would use, from the manufacturer's side.
You already hold the complete design — input/output wiring, full specs. That turns a generic compatibility check into a precise one.
One engagement, one upload, one finding — no ongoing software relationship to manage afterward.
Whether you're specifying an expansion or keeping today's fleet healthy, it's the same platform either way.
Round-trip efficiency, backup runtime, and battery bus voltage under boost charge — sourced from BEE Books 3/4 and the relevant IEC/IEEE clauses, executed as real deterministic calculations, never left to AI memory.
How known UPS and battery faults actually present in logged data — the same content that powers symptom-triage hypothesis ranking when a technician reports a crude, free-text symptom.
IEC 61000, IEEE 519, IS 3043 earthing checks, and BEE Book 3/4 benchmark curves by kVA band — cited specifically, not just referenced by name.